HERE IS A SEPTIC SYSTEM INSTALL FOR A NEW HOUSE IN STRASBURG CO. TANK IS 1,060 GALLON PLASTIC TANK AND FIELD IS AN INFILTRATOR DESIGN.
Design of system: WW Enterprises.
Aggregate Supplier: NA
Plastic Supplier: Plastics Inc.
Tank Supplier: Plastics Inc.
County: Arapahoe
We began with the septic line leading out of the skirt of the modular home and down to the tank. 24″ of risers.
The outlet leads 19′ down to a 45 degree turn… All 4″ schedule 40 pipe.
The line then leads downhill to the Distribution box..
It’s extremely important that the Distribution Box is level, North->South and East -> West.
It’s also important the all pipe is level, and bedded. Bedding is a process of setting the foundation for the pipe, so that it does not move when backfilling.
All pipes must be level!
More bedding…
Finally, risers are screwed on, and the clean out glue to future grade (very back of picture)