730 S. Main St. Elizabeth, CO
THIS WAS TIGHT QUARTERS! WE ADDED A 500 GALLON PUMP TANK, WITH GRINDER PUMP, TO PUMP UP TO THE ELIZABETH CO SEWER SYSTEM. TANK WAS INSTALLED BETWEEN THE HOMEOWNERS DECK AND STAIRS TO THE STREET!
Design of system: Bill Vogel/TBC
Aggregate Supplier: NA
Plastic Supplier: Plastics Inc.
Tank Supplier: Plastics Inc. (Infiltrator Tanks)
County: Elbert